Your Best Concrete Formwork Manufacturer
TSX in China
Concrete Formwork Related Products
Steel Formwork Systems are commonly made of Steel Formwork System construction & casting is of prime importance in the concrete industry.
It Provides great help for precast concrete or cast-in-place concrete projects.
Advantages :
Great reusability.
Steel Forms are durable and stronger.
Easy to fix the Formwork and also easy to dismantle.
Provides a uniform and smooth surface finish to the structure.
Certificated Types of OEM Concrete Formwork Products Factory
All related Scaffolding and Steel Formwork System Products are all welcomed.
OEM Products with Drawing & Design will be highly Accepted.
Manufacturing Factory For Concrete Formwork
FAQ
You can send us your material list to request a quotation, or you can also simply
send us the structural drawing and project information for the concrete formwork
proposal via the contact page.
There are nearly 70% of standard panels that can be commonly used.
Our concrete formwork width is about 100mm-900mm.
Yes, we can do 600mm.
The price of the Concrete Formwork is calculated according to the size and weight.
The price is not fixed.
It is necessary to check the real-time exchange rate and the market price of raw
materials.
Concrete Formwork means the surface of the form and framing used to contain and shape wet concrete until it is self-supporting. Concrete Formwork includes the forms on or within which the concrete is poured and the frames and bracing which provide stability.
You can tell us the height of your building or we can give you a suitable specification based on our experience in your market. We also provide several sizes.
Steel is the most commonly used Concrete Formwork material.
For concrete slabs, the Concrete Formwork can usually be removed after 3 days, and
the pillars can be removed after 2 weeks.
Concrete usually takes 24 to 48 hours to dry enough for you to walk or drive on
Concrete Formwork.
However, concrete drying is a continuous and flowing process, which usually sets
completely after about 28 days.
In addition to steel, concrete formwork can also be made of wood and plywood. These materials can be used alone or together. The most common type of concrete formwork in heavy civil construction is steel.
As the vertical height of the poured concrete increases, the substance will generate lateral pressure when pushing the inner surface of the formwork. Waiting for the concrete to dry, the desired wall or column can be obtained.
It should be noted that if too much concrete is poured at one time, and the strength of the connection device is not strong enough to withstand the pressure, the wet concrete may break through the concrete formwork.
a. Use and properly apply the specially developed release agent to lubricate the mold to avoid mold release problems;
b. Vibrate the concrete at several points in the concrete to avoid the abrasion of the release agent;
c. When pouring concrete into the concrete formwork, it must be moved to avoid degradation of the release agent;
d. Let the concrete completely solidify and harden to avoid the chance of vacuum;
e. Adopt good mold management, maintenance, and cleaning.